logo-odot

REQUEST for PROPOSALS UTILIZING ODOT RFP 730-33447-18

Project Information The purpose of the Project is to improve the safety and operations on I-5 between I-405 and I-84, of the Broadway/Weidler interchange, and on adjacent surface streets in the vicinity of the Broadway/Weidler interchange and to enhance multimodal facilities in the Project Area. In achieving the purpose, the Project also will support improved local connectivity and multimodal access in the vicinity of the Broadway/Weidler interchange and improve multimodal connections between neighborhoods located east and west of I-5. The Project addresses the following primary needs:

• I-5 Safety: I-5 between I-405 and I-84 has the highest crash rate on urban interstates in the State of Oregon. Crash data from 2011 to 2015 indicate that I-5 between I-84 and the merge point from the NE Broadway ramp onto I-5 had a crash rate (for all types of crashes) that was approximately 3.5 times higher than the statewide average for comparable urban interstate facilities.

• I-5 Operations: The Project Area is at the crossroad of three regionally significant freight and commuter routes: I-5, I-84, and I-405. As a result, I-5 in the vicinity of the Broadway/Weidler interchange experiences some of the highest traffic volumes in the State of Oregon, carrying approximately 121,400 vehicles each day, and experiences 12 hours of congestion each day.

• Broadway/Weidler Interchange Operations: The complexity and congestion at the I-5 Broadway/Weidler interchange configuration is difficult to navigate for vehicles (including transit vehicles), bicyclists, and pedestrians. This impacts access to and from I-5 as well as to and from local streets. The high volumes of traffic on I-5 and Broadway/Weidler in this area contribute to
congestion and safety issues (for all modes) at the interchange ramps, the Broadway and Weidler overcrossings of I-5, and on local streets in the vicinity of the interchange.

• Travel Reliability on the Transportation Network: Travel reliability on the transportation
network decreases as congestion increases and safety issues expand. The most unreliable travel
times tend to occur at the end of congested areas and on the shoulders of the peak periods. Due to
these problems, reliability has decreased on I-5 between I-84 and I-405 for most of the day. Periods
of congested conditions on I-5 in the Project Area have grown over time from morning and
afternoon peak periods to longer periods throughout the day.

ODOT is conducting this Intermediate Procurement in conformance with ORS 279B.070 and OAR 137-047-0270. No specific level of work or funding is guaranteed by this solicitation process.
Work is anticipated to begin 8-1-2018 and is anticipated to be completed 11-30-2018. The Consultant shall not have or be perceived to have a conflict of interest when performing any of this work.
Proposer must be in compliance with the ODOT COI Guidelines.

Form are available at the following Internet site:
http://www.oregon.gov/ODOT/Business/Procurement/Pages/PSK.aspx under “Miscellaneous Procurement Forms”).
*********DEADLINE FOR RESPONSE IS: July 26, 2018 at 2:00pm*********

RFP 33447 Final